Showing posts with label Heater. Show all posts
Showing posts with label Heater. Show all posts

Sunday, 23 August 2020

FHC resto nr. 100; A jubilee post

On the 19th of October 2013 I became the owner 03-NF-52, a fairly early Dutch TR7. The car was first registered on the 6th of October 1976. At the time I didn’t really want to buy another TR7, but the car was fitted with my favourite alloy wheels for a TR7. And the price was right. So I bought a slightly over priced set of Wolfrace Turbo wheels with a car attached to them 😳. And as soon as the car was in the shed the wheels were removed, refurbished, and fitted to my DHC.

Initial plan was to get rid of the car and make a small profit! But my longing for an early car (with a few twists) was stronger. New plans were made, and on Wednesday the 15th of January 2014 I started with the first stage of the restoration, dismantling the car. My initial time schedule was to have the car ready by the time it would be tax exempt in October 2016. But that schedule has since been abandoned!

And this weekend I reached the ninety-ninth blog post on the restoration of this TR7. Time to celebrate this fact with a jubilee post! So for the hundredth post I will bore you with a picture post. Looking back at the work done, using my favourite pictures and parts of the project so far.

2013-10-20: Patiently waiting for the things to come.
In the shed alongside ‘t Kreng.

2014-02-12: Dismantling completed.

2014-03-15: A photographic experiment with the bare seat frames.
Shortly before they were sent off for blasting and coating.

2014-03-15: Rear suspension parts ready,
which was fairly easy as I had already prepared them as spares!

2014-03-30: 14” Moto Lita Mark Four steering wheel with a custom design billet centre cap, using an original late TR7 steering wheel’s centre badge

2014-05-24: Rectifying the butchered boot floor
and the incorrect late-small-filler-cap-rear-deck.

2014-06-25: Creating access for various relative small repair sections

2014-07-10: Welding completed and waiting for final shot blasting,
and application of a base coat primer

2014-07-30: Collected the seats (and other interior trim parts) from a local car trimmer. The Tartan cloth was ordered (after much mail traffic) from House of Tartan, with the pattern being based on the Menzies Clan’s black & red tartan. And this pattern was  adapted slightly to my personal taste.

2014-07-30: As the original parcel shelf was beyond repair, I ordered a GRP replica.
But it’s finish was so bad that I had it recovered too. And I have to admit it looks brilliant!

2014-08-25: The car was moved for the next stage: paint preparations.

2014-11-08: Paint preparations slowly taking shape.

2015-02-05: The first visit to the painters. The interior, the engine bay and the underside painted in “Nearly-Topaz-Orange”.

2015-06-13: The body, doors, boot lid and bonnet are ready for painting.

2015-09-07: Painted in its chosen colour at last, and waiting for the satin black paint to be applied to the sills and the rear light panel.

2015-09-14: Painting completed and temporary back in the shed.

2016-01-14: One of the little projects that got out of hand time wise.
Re-manufacturing the body tags (with a twist) and the VIN plate.

2017-05-25: Inspecting the inside of the fuel tank after powder coating the exterior,
but prior to preparing and coating the inside.

2017-05-30: The back of the car slowly taking shape.

2014-12-20: Lots of smaller parts after sand blasting.

2018-01-04: And some of these parts after zinc plating and (black) passivating.

2018-03-31: A sad farewell. Clearing the shed at René’s place after he passed away.

2018-06-30: Slowly picking up work on the car again …

2018-09-14: The finished headlamp supports.

2018-11-03: Fitting the bonnet stay with my daily driver patiently waiting outside the shed.

2019-01-06: Refurbished parts for the boot lid lock mechanism.

2019-03-23: The interior slowly taking shape after fitting the reconditioned heater unit.

2019-09-23: Fitting the striping to the doors.

2019-12-08: Refurbishing the door handles finished.

2019-12-27: Fitting the door lock mechanism and VIN plate
(for the anoraks, I turned it through 180°)

2020-02-29: Fitting a few exterior trim parts.

Sunday, 24 March 2019

FHC resto nr. 78; Heater rebuild final part (#9)


At last there is light at the end of the tunnel, because you are reading what looks like the last report on the car’s heater rebuilt (fingers crossed!). Yesterday saw the  final saga of this project in a project: fitting the heater to the car. But there were some smaller jobs that had to be done first.
I fitted an extra (second) fixing point to the bulkhead seal plate, so I had to drill an extra hole for this. This was the easy bit, because I thought it would be much simpler to use the seal plate as a template when it was not fitted to a cumbersome heater! Indeed was only a few minutes job, certainly helped by a proper quality step-drill. And with the new hole in place in the correct position it was time for the final assembly of the heater, fitting the coolant pipes and bulkhead seal plate:


I had hoped that after all the preparations done already this would be straight sailing. It wasn’t, the heater certainly kept the fight up right till the end! Because there was only very little room to manoeuvre, fitting the two short hoses between the heater matrix and the shortened steel pipes took some more time than expected. All rather frustrating. But after almost an hour everything was in place, and ready to be fitted to car.
Again the heater didn’t quite cooperate. But overall this went pretty smooth. I first manoeuvred the heater in place and loosely fixated it with the bolt on top of fresh air inlet.


After that I moved to the engine bay to put the nuts on the three mounting studs.


And finally the two bolts for the brackets on top of the transmission tunnel could be put in position. And with all nuts and bolts in place it was time for a final alignment check after which the nuts and bolts could be torqued down.


And finally a close up of the pipe work:


An afternoon well spend. And with the heater in place I can continue in earnest with some other jobs, to start with the wiring loom that fits around the heater!

Sunday, 10 March 2019

FHC resto nr. 77; Heater rebuild part 8


Again a set back with the heater’s connecting tubes. It has already been several months ago that I visited the shed in search of a good original heater pipe assembly. But before sending it of for coating I thought it a good idea to have the ends shot blasted first to check if there was enough metal left there to get a water tight seal. There was. After which it was well over a month later that I finally found time and motivation to have them galvanised. Sadly something went wrong there and the assembly was badly damaged. Both pipes were torn from the mounting plate leaving me with three loose and parts:


Being rather fed up with the whole thing I decided to go back to one of my initial ideas for the pipes’ fire wall crossing. As the base plate was badly deformed where the tubes had been welded to it I decided to use the plate I prepared for my original set up last year. But with a slight adaptation of the extra mounting point to make sure this wouldn’t foul the larger grommets now being used: 



In my previous post I mentioned an upgrade I am working on for the DHC (actually PAS). As there still are some doubts about the clearance for such a set up I decided on another trip to the shed. This time  for a comparison picture of some inlet manifolds. Clearly visible is that the FI manifold needs some extra space at the front where the PAS pump should sit. And one of the other future plans is to the fit a modern injection set up to the DHC using an original set up as base:


Both to be continued, the heater hopefully soon! Because as long as that isn't fitted I can't and won't start with the wiring and the rest of the remaining jobs on the car …

Monday, 17 September 2018

FHC resto nr. 69; Heater rebuild part 7

This should have been the final chapter of the heater rebuild! Sadly I had to take a few steps backwards. First I had to remove the back plate for the bulkhead seal from the heater unit. Not because anything was wrong with it, but because I decided it could do with some detail changes.
With the original set-up the steel tubes supply some of the rigidity to the plate to help press the seal more firmly against the bulk head. But while measuring an old seal for remanufacturing purposes, I noticed that even with the original set-up the seal wouldn't seat  properly against the bulk head!  Time for a redesign of the plates mounting, especially as the coolant tubes don't support the plate anymore, because they just pass through the original holes without any physical connection. And the plastic tabs on the heater body, to which the back plate is riveted, look rather flimsy too. This prompted me to add a second mounting bracket to the plate. It not only adds stability to the plate, it also helps with compressing the seal better!
With this part ready I used the back plate as a template to generate a DXF-file, which in turn was used by Rubberhuis Maastricht to fabricate the (cell foam rubber) seal, using modern CNC equipment. They also used this equipment to fabricated the condensation drain seal, which is fitted between the bottom of the heater's fan housing and the transmission tunnel:



Next it was time to remanufacture a new seal to go between the heaters fresh air intake and the bulk head. For this I also used cell foam rubber, a self adhesive rectangular profile of 20 x 15 mm. And with four carefully measured 90° V's cut from the seal, it could be fitted to its designated location:


With all seals ready and fitted where possible, it was time for the heater's final assembly; refitting the back plate and fitting the coolant hoses between the heater's matrix and the pipes passing through the bulkhead. At least that's what I had hoped for. Sadly even with the fairly slim heater hose I had acquired, it  was still impossible to negotiate the bends needed to fit the hose between heater matrix and bulk head passage. Especially the radius for the top hose turned out to be impossible tight for a proper fit.
Time for another step back and plan B, consisting of a stainless heater pipe assembly for the original heater layout, purchased through one of the rather reputable TR7 suppliers in the UK:


Which was duly cut down approximately in the middle of the pipes, shortening the necessary hose length considerably. But most importantly this got rid of the tight bend for the top hose, at least it should have ... The picture above does give a clue to what's the main problem. The two pipes are identical and much too far apart in the centre section. As a result of this even with the top pipe hard against the ventilator motor there still is an almost 10 mm gap between the rivet holes in the base plate and the ones on the heater's casing, not good! Luckily I still had the old pipes lying around for comparison:


Clearly visible is the difference in shape between the aftermarket stainless pipes and the original ones. And this frontal shot of the assembly clearly shows the rather poor quality of the work done by whoever fabricated it:


So instead of fitting the heater to the car I will have to adapt/prepare the original pipes and use them instead. To be continued, but hopefully not for too long!