Last weekend I visited the workshop where the DHC’s body is undergoing some much needed repairs. First job was inspecting the pile of body parts left over from the donor body shell. The result of drilling and grinding every evening for two weeks. A small selection of the most important parts for the body’s repairs;
And with the various parts inspected it was time to put the angle grinder into the body. But not before a simple brace was fitted to prevent distortion of the body. To check this, the doors were also fitted to the body. And some control measurements were taken.
After which it was time to put the angle grinder to the right hand sill. As you can see there is a fair amount of tin worm in that sill;
No comments:
Post a Comment